D12.2 CROSSBOW integrated ecosystem lab testing
Previous to the large demonstration phase, with the first results coming from SP2, SP3, SP4, and SP5 – considering as the basis the first version of the products planned by M24 – a number of integration tests in controlled conditions are run. The objective is not to validate the individual components on their own – unitary tests – but rather to verify that the collaboration between different products to implement a specific HLU is achieved before going to real-life deployment. At least two laboratories will be used – in Greece and Croatia – to validate for the first time the full project ecosystem as a whole